Beacon Hill

Peachtree Street and Beacon Hill

Peachtree Street and Beacon Hill

Beacon Hill

KNITTED

Materials Required: AMERICAN THREAD COMPANY“DAWN” PERMANENT “CRIMP SET” NYLONor“DAWN” BRAEBURN SPORT YARNor“DAWN” SOCK & SWEATER YARN

10 ozs. Pink or color desired.1 oz. Black.1 pr. each knitting needles No. 2 and No. 5Steel crochet hook No. 3.

On No. 2 needles cast on 69 sts and work in ribbing of K 1, P 1 for 4¹⁄₂ inches, increasing 68 sts evenly spaced on last row of ribbing (137 sts). Change to No. 5 needles and work in pattern as follows:

1st Row.K 8, * P 2, K 2 tog, YO, K 1, YO, sl 1, K 1, p.s.s.o., repeat from * across row, ending row with P 2, K 8.

2nd Row.K 10, * P 5, K 2, repeat from * across row, ending row with P 5, K 10.

3rd Row.K 8, * P 2, K 5, repeat from * across row, ending row with P 2, K 8.

4th Row.Same as 2nd row.

Repeat last 4 rows until work measures 50¹⁄₂ inches from the beginning. Change to No. 2 needles, work in ribbing decreasing 68 sts evenly spaced (69 sts). Work even in ribbing for 4¹⁄₂ inches, bind off. Block shoulderette. Sew ribbing and 6 inches above ribbing together.

EDGE: With wrong side of work toward you attach Black at end of seam, 1 s c in same space, * ch 3, 1 s c in 2nd st from hook, 1 s c in next st of ch, skip ¹⁄₈ inch space, s c in next space, repeat from * all around shoulderette, cut yarn. Work same edge around each cuff. Tack collar back as illustrated.


Back to IndexNext